Tuesday, October 25, 2011

Interior Cabinetry

Started the interior cabinetry. I have the area for the power converter and electrical in the upper right. The wood doesn't match but I plan to paint it black anyways just in that area. Lower middle will be a slide out for a the laptop, which will be used for tv, movies, music throughout the teardrop. I will be installing a router (Linksys runs on 12v DC) for using my iphone as a remote control through iTunes for music and movies. The rest is just general storage area.

0 comments:

Post a Comment

 

©2009Moho's Teardrop | by TNB